£5 · Table lamp multicolour mosaic green lampshade long lead 39cm high
table lamp base mosaic with green lampshade and with long lead
Approx. height of the base is 39cm or 15.5"
The lampshade is still brand new with wraping
Collection from Penn WV4 4AJ
Details | Today: | Yesterday: | To Date: |
---|---|---|---|
Viewed: | |||
Browsed: | |||
Other Information | |||
Ad Id | 25830080 | ||
Category | Lamps | ||
Posted | January 11, 2018 | ||
Renewed | May 19, 2018 | ||
Expiry | June 18, 2018 | ||
Status | SOLD | ||
Details |